Widefield Transportation Facility
Colorado Springs, CO

Project Details

PK-12 Education

Market
Widefield School District 3
Client
CM/GC
Service
April 2008
Completion Date
25,000 sq. ft.
Size
LKA Partners, Inc.
Architect

This 18,000 SF facility houses an 11,000 SF full service bus maintenance garage located on a 5.4 acre site. The building includes administrative offices, training facilities a fully equipped kitchen and lounge area.

Sustainable design features were incorporated throughout the design including; high ceilings and clearstory windows that provide natural lighting, high efficiency energy glass systems, sustainable flooring materials, light shelves, exterior sunshade canopies, high R value efficient conserving insulation, high efficiency gas fired rooftop units and construction waste recycling.

  • Central Transportation Hub for D-3 Fleet
  • 13 Acre Site Development
  • Cost Savings with Self-Performed Maintenance
  • Sustainable and Energy Efficient Design
“Nunn Construction delivered a truly quality product in a timely manner and treated our project as if it was their own. They worked very closely with us throughout the process to ensure all our special requirements were addressed to our satisfaction. ”
Donald Shiverdecker Executive Director - Widefield School District 3